platformOS doesn't have a built-in scheduler for recurring jobs, but you can build one with background jobs: a job that schedules the next runs of your work, and then schedules itself again.

This tutorial builds a report that runs every day.

Requirements

How it works

The simplest approach, a job that does its work and schedules itself for tomorrow, stops after about 1000 days, because each job it schedules counts as one more step in the same chain. See Jobs scheduled by other jobs.

Instead, split the work into two jobs:

  • The scheduler runs once a month. It schedules the daily job for each of the next 30 days, and then schedules itself to run again in 30 days.
  • The daily job does the actual work and doesn't schedule anything.

Only the scheduler schedules itself, so the chain grows by one step per month, not per day, and lasts for about 1000 months. The 30 daily jobs are all scheduled by the same scheduler, so they don't use up the limit.

To be able to stop or change the schedule, every run of the scheduler passes a schedule ID to the jobs it creates. The current schedule ID is stored in a constant, and the daily job only does its work if its schedule ID is still the current one.

Step 1: Create the daily job


{% comment %}app/views/partials/jobs/daily_report.liquid{% endcomment %}
{% liquid
  if schedule_id == context.constants.DAILY_REPORT_SCHEDULE_ID
    # ... generate the report here
    log 'Report generated', type: 'daily-report'
  else
    log 'Skipped a job from an inactive schedule', type: 'daily-report'
  endif
%}

Step 2: Create the scheduler


{% comment %}app/views/partials/jobs/schedule_daily_report.liquid{% endcomment %}
{% liquid
  if schedule_id == context.constants.DAILY_REPORT_SCHEDULE_ID
    # Schedule the next run of the scheduler first, so that an error below doesn't stop the schedule
    background job_id = 'jobs/schedule_daily_report', delay: 43200, priority: 'low', source_name: 'schedule-daily-report', schedule_id: schedule_id

    for day in (1..30)
      assign delay = day | minus: 1 | times: 1440
      background job_id = 'jobs/daily_report', delay: delay, priority: 'low', source_name: 'daily-report', schedule_id: schedule_id
    endfor
  endif
%}

delay is in minutes: 1440 is one day, and 43200 is 30 days. The first daily job runs right away and the last one 29 days later. On day 30, the scheduler runs again and schedules the next 30 days.

Step 3: Start the schedule

Start the schedule from a page, for example an admin page protected by an authorization policy. It generates a new schedule ID, stores it in the constant, and starts the scheduler:


# app/graphql/constants/set.graphql
mutation set_constant($name: String!, $value: String!) {
  constant_set(name: $name, value: $value) {
    name
  }
}


{% comment %}app/views/pages/admin/start-daily-report.liquid{% endcomment %}
{% liquid
  assign schedule_id = '' | uuid
  graphql _ = 'constants/set', name: 'DAILY_REPORT_SCHEDULE_ID', value: schedule_id
  background job_id = 'jobs/schedule_daily_report', priority: 'low', source_name: 'schedule-daily-report', schedule_id: schedule_id

  echo 'Daily report scheduled'
%}

A job started from a page begins a new chain, so the schedule starts with the full limit.

Changing or stopping the schedule

To change the schedule, update the scheduler and visit the start page again. The new schedule ID replaces the old one, so the jobs that the old schedule already created run, see that their schedule ID is no longer current, and do nothing.

To stop the schedule, set the constant to a different value, or delete it.

If you want to remove the inactive jobs from the queue as well, delete them with GraphQL, filtering by source_name. This step is optional: inactive jobs don't do any work.

Stopping a run that is in progress ends only that run. Because the scheduler schedules its next run first, the schedule goes on. To end the schedule, change the constant as described above.

Tip

Instead of a constant, you can keep your schedules in a table, and make the job check that the record of its schedule still exists. Deleting the record cancels all of its jobs.

Making the job safe to run more than once

Background jobs can run more than once, for example when a failed job is retried, when a schedule is started twice, or when you run a job again after stopping it. Write the daily job so that a second run doesn't cause harm: for example, store the date of the last report and skip the work if today's report already exists.